NSE: TICL · CIVIL CONSTRUCTION

Twamev Construction and Infrastructure Limited Share Price & Company Info

₹7.33-3.30%

End-of-day price, · Educational content, not investment advice

52W low ₹5.3352W high ₹33.99
Market cap
₹98.27 Cras reported by NSE
52-week high
₹33.9911-NOV-2025
52-week low
₹5.3323-SEP-2026
P/E (NSE)
13.94
Face value
₹1.00
Shares issued
15,50,00,000
Volume
94,636₹0.07 Cr traded
Delivery
68.76%of traded quantity
Price band
5%₹5.89 – ₹6.49 on 2026-11-02
Annual volatility
69.16%NSE, from daily returns
Series
EQrolling settlement
BSE group
Bscrip code 532738
ISIN
INE388G01026
Listed on NSE
16-Oct-2023

About Twamev Construction and Infrastructure Limited

Twamev Construction and Infrastructure Limited is listed on the National Stock Exchange of India under the symbol TICL in the EQ series. NSE classifies it under the basic industry Civil Construction, part of the Construction sector within the broader Industrials group. Its shares were listed on NSE on 16-Oct-2023. Each share has a face value of ₹1.00.

In the end-of-day data for 16 November 2026 the stock closed at ₹7.33, down 3.30% on the day. NSE puts the company's market capitalisation at about ₹98.27 crore, which puts it among the smallest listed companies in India. Over the past 52 weeks it has traded between ₹5.33 and ₹33.99, so the last price is 37.5% above the low and 78.4% below the high.

94,636 shares changed hands that day, and 68.76% of them were taken as delivery rather than squared off intraday. A high delivery share means most of the day's buyers chose to hold the shares; a low one usually means the volume was mostly short-term trading.

EQ is the normal equity series: shares settle on the usual T+1 cycle and intraday trading is allowed.

NSE currently lists a regulatory note for this stock: “LT ASM-2”. Notes like these come from the exchange's surveillance and disclosure checks and can mean higher margins, trade-for-trade settlement or limits on trading. Check the NSE quote page for the current position before trading.

NSE puts the stock's annualised volatility at 69.16%. That is very high: moves of several percent in a single day are routine.

Because the share trades below ₹10, it also appears in our list of penny stocks under ₹10, which explains the extra risks that come with low-priced shares.

Twamev Construction and Infrastructure Limited quarterly results

In the quarter ended June 2026 (un-audited), Twamev Construction and Infrastructure Limited reported total income of ₹11.27 crore and a net profit of ₹0.74 crore, or ₹0.05 per share. That is a net margin of 6.6% on income.

Compared with the previous quarter (March 2026), income fell 50.5%.

Twamev Construction and Infrastructure Limited was profitable in 4 of the 4 quarters shown below, every one of them. Figures are as filed with NSE, in ₹ crore.

Quarterly results filed with NSE (₹ crore, EPS in ₹)
Quarter endedTotal incomeProfit before taxNet profitEPSStatus
June 202611.270.740.740.05Un-Audited
March 202622.791.871.910.13Audited
December 202521.031.801.800.12Un-Audited
September 202525.455.405.400.35Un-Audited

Twamev Construction and Infrastructure Limited shareholding pattern

At the end of September 2026, promoters and the promoter group held 71.98% of Twamev Construction and Infrastructure Limited, with the public holding 28.02%. That is down 22.35 percentage points from 94.33% in December 2024.

A falling promoter stake is one of the things investors watch most closely in small companies, because it can signal insiders selling. The quarterly shareholding filings on NSE show who bought or sold.

Shareholding by category, as filed with NSE each quarter
Quarter endedPromoter & Promoter Group (%)Public (%)
September 202671.9828.02
June 202683.0516.95
March 202684.0615.94
December 202584.5215.48
September 202585.1314.87
June 202589.3710.63
March 202594.335.67
December 202494.335.67

Twamev Construction and Infrastructure Limited share price performance

Over the past year the Twamev Construction and Infrastructure Limited share price has lost 78.17%, against a fall of 10.92% for the NIFTY 50, so it has underperformed that index by 67.25 percentage points.

Across the 6 periods in the table, the stock did not beat the NIFTY 50 in any of them. Past returns describe what happened; they do not predict what comes next.

Price change by period, as of 2026-11-02 (NSE)
PeriodTICLNIFTY 50
1 month-13.21%+1.91%
3 months-31.20%-5.20%
6 months-73.01%-3.94%
1 year-78.17%-10.92%
2 years-82.57%-5.29%
3 years-70.19%+20.44%

Twamev Construction and Infrastructure Limited vs industry peers

NSE compares Twamev Construction and Infrastructure Limited with 6 other listed companies in Civil Construction. By market capitalisation it ranks 4 of 7.

Its P/E of 13.94 compares with a median of 8.70 for the other companies in the group: the market is paying considerably more for each rupee of its recent earnings.

NSE industry peer comparison, results for JUN 2026 quarter (₹ crore)
CompanyMarket capPrice (₹)P/EPromoter %Qtr incomeQtr net profit
HECPROJECT110101.158.7074.9331.401.37
BCPL10864.80—72.8727.172.03
GIRIRAJ10443.306.930.00——
TICL99.826.4413.9483.0511.270.74
USK96.8717.508.2967.3546.462.46
NAVKARURB96.500.8632.2635.000.820.29
LAKSHYA95.8595.059.560.00——

Twamev Construction and Infrastructure Limited announcements, board meetings and corporate actions

Latest announcements

The most recent filings Twamev Construction and Infrastructure Limited has made with NSE, newest first:

  • 14-Oct-2026 · General Updates: Twamev Construction and Infrastructure Limited has informed the Exchange Newspaper publication regarding Special Window for Transfer and Dematerialization of Physical Securities. (PDF)
  • 08-Oct-2026 · Certificate under SEBI (Depositories and Participants) Regulations, 2018: Twamev Construction and Infrastructure Limited has informed the Exchange regarding Reconciliation of Share Capital Audit Report as per SEBI (Depositories and Participants) Regulations, 2018 for the quarter ended 30th September, 2026. (PDF)
  • 07-Oct-2026 · Updates: Twamev Construction and Infrastructure Limited has informed the Exchange regarding 'Sale of Shares executed by one of the member of the Promoter Group, M/s Upendra Singh Constructions Co Pvt Ltd'. (PDF)
  • 06-Oct-2026 · Certificate under SEBI (Depositories and Participants) Regulations, 2018: Twamev Construction and Infrastructure Limited has informed the Exchange about Certificate under SEBI (Depositories and Participants) Regulations, 2018 as per Regulation 74(5) for the quarter ended 30th September, 2026. (PDF)
  • 25-Sep-2026 · Trading Window: Twamev Construction and Infrastructure Limited has informed the Exchange regarding the Trading Window closure pursuant to SEBI (Prohibition of Insider Trading) Regulations, 2015 (PDF)
  • 24-Sep-2026 · General Updates: Twamev Construction and Infrastructure Limited has informed the Exchange regarding sale of shares executed by the Promoter and Promoter Group of the Company, on 23rd September, 2026. (PDF)
  • 23-Sep-2026 · General Updates: Twamev Construction and Infrastructure Limited has informed the Exchange regarding Consolidated Scrutinizer's Report and Voting Results for the FY 2025-26. (PDF)
  • 22-Sep-2026 · General Updates: Twamev Construction and Infrastructure Limited has informed the Exchange about Intimation of sale of shares by Promoter and Promoter Group, Mr. Ravi Todi, M/s Ravi Todi HUF and M/s Nadia Security Printing and Stationery Co Pvt Ltd, respectively, to achieve the MPS of the Company. (PDF)

Board meetings

  • 11-Aug-2026 · Financial Results: To consider and approve the financial results for the period ended Jun 30, 2026
  • 29-May-2026 · Financial Results: To consider and approve the financial results for the period ended March 31, 2026
  • 29-May-2026 · Financial Results: Intimation of Board Meeting under Regulation 29 of SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015
  • 31-Jan-2026 · Financial Results: To consider and approve the financial results for the period ended December 31, 2025
  • 12-Nov-2025 · Financial Results: To consider and approve the financial results for the period ended September 30, 2025

Risk notice: low-priced and small-company shares can be illiquid, volatile and subject to manipulation, and shareholders can lose their entire investment. This page is a factual summary, not a recommendation to buy or sell Twamev Construction and Infrastructure Limited.

Where to find Twamev Construction and Infrastructure Limited's financials

Direct downloads from NSE:

For full financial statements, shareholding detail and every company announcement, go to the source:

Other Civil Construction stocks on MCX Trends

Frequently asked questions

What is the Twamev Construction and Infrastructure Limited share price?

Twamev Construction and Infrastructure Limited (NSE: TICL) closed at ₹7.33 in the end-of-day data for 16 November 2026. For a live price, use the NSE quote page or your broker, because this page is updated from end-of-day files.

Which sector does Twamev Construction and Infrastructure Limited belong to?

NSE classifies Twamev Construction and Infrastructure Limited under Civil Construction, in the Construction sector.

What is the 52-week high and low of TICL?

The 52-week high is ₹33.99 (11-NOV-2025) and the 52-week low is ₹5.33 (23-SEP-2026), according to NSE.

Is Twamev Construction and Infrastructure Limited a penny stock?

At ₹7.33 the share trades below ₹10, so it appears on our list of penny stocks under ₹10. A low share price on its own says nothing about whether a company is cheap or expensive; market capitalisation, debt, profits and exchange surveillance status matter far more.

What is the promoter holding in Twamev Construction and Infrastructure Limited?

Promoters and the promoter group held 71.98% of Twamev Construction and Infrastructure Limited at the end of September 2026, according to the shareholding pattern filed with NSE.

What were Twamev Construction and Infrastructure Limited's latest quarterly results?

For the quarter ended June 2026, Twamev Construction and Infrastructure Limited reported total income of ₹11.27 crore and a net profit of ₹0.74 crore (EPS ₹0.05).

Where can I find Twamev Construction and Infrastructure Limited's annual report and financial results?

Annual reports, quarterly results and other filings are published on the NSE corporate filings pages (search for TICL) and on BSE. Screener also lays out several years of financial statements in one place. Links to all of these are above.

More on MCX Trends