Sadbhav Infrastructure Project Limited Share Price & Company Info
- Market cap
- ₹80.31 Cras reported by NSE
- 52-week high
- ₹4.7911-FEB-2026
- 52-week low
- ₹2.0429-OCT-2026
- P/E (NSE)
- 1.11sector P/E 0.42
- Face value
- ₹10.00
- Shares issued
- 35,22,25,216
- Volume
- 2,93,111₹0.09 Cr traded
- Delivery
- 68.44%of traded quantity
- Price band
- 10%₹2.04 – ₹2.48 on 2026-11-02
- Annual volatility
- 57.31%NSE, from daily returns
- Series
- EQrolling settlement
- BSE group
- Bscrip code 539346
- ISIN
- INE764L01010
- Listed on NSE
- 16-Sep-2015
About Sadbhav Infrastructure Project Limited
Sadbhav Infrastructure Project Limited is listed on the National Stock Exchange of India under the symbol SADBHIN in the EQ series. NSE classifies it under the basic industry Road Assets - Toll Annuity Hybrid-Annuity, part of the Services sector. Its shares were listed on NSE on 16-Sep-2015. Each share has a face value of ₹10.00.
In the end-of-day data for 16 November 2026 the stock closed at ₹3.16, down 3.36% on the day. NSE puts the company's market capitalisation at about ₹80.31 crore, which puts it among the smallest listed companies in India. Over the past 52 weeks it has traded between ₹2.04 and ₹4.79, so the last price is 54.9% above the low and 34.0% below the high.
2,93,111 shares changed hands that day, and 68.44% of them were taken as delivery rather than squared off intraday. A high delivery share means most of the day's buyers chose to hold the shares; a low one usually means the volume was mostly short-term trading.
EQ is the normal equity series: shares settle on the usual T+1 cycle and intraday trading is allowed.
NSE currently lists a regulatory note for this stock: “Less than 100 unique PAN traded in prev. 30 days”. Notes like these come from the exchange's surveillance and disclosure checks and can mean higher margins, trade-for-trade settlement or limits on trading. Check the NSE quote page for the current position before trading.
NSE puts the stock's annualised volatility at 57.31%. That is well above the level of large, established companies, so double-digit swings within a month are common.
Because the share trades below ₹5, it also appears in our list of penny stocks under ₹5, which explains the extra risks that come with low-priced shares.
Sadbhav Infrastructure Project Limited quarterly results
In the quarter ended June 2026 (un-audited), Sadbhav Infrastructure Project Limited reported total income of ₹7.02 crore and a net profit of ₹17.59 crore, or ₹0.50 per share. That is a net margin of 250.6% on income.
Compared with the previous quarter (March 2026), income fell 21.7%.
Sadbhav Infrastructure Project Limited was profitable in 2 of the 4 quarters shown below. Figures are as filed with NSE, in ₹ crore.
| Quarter ended | Total income | Profit before tax | Net profit | EPS | Status |
|---|---|---|---|---|---|
| June 2026 | 7.02 | 17.59 | 17.59 | 0.50 | Un-Audited |
| March 2026 | 8.97 | 176 | 176 | 4.98 | Audited |
| December 2025 | 2.85 | -120 | -120 | -3.41 | Un-Audited |
| September 2025 | 2.84 | -19.86 | -19.86 | -0.56 | Un-Audited |
Sadbhav Infrastructure Project Limited shareholding pattern
At the end of September 2026, promoters and the promoter group held 70.25% of Sadbhav Infrastructure Project Limited, with the public holding 29.75%. The promoter stake has not changed across the 8 quarterly filings shown, from December 2024 to September 2026.
| Quarter ended | Promoter & Promoter Group (%) | Public (%) |
|---|---|---|
| September 2026 | 70.25 | 29.75 |
| June 2026 | 70.25 | 29.75 |
| March 2026 | 70.25 | 29.75 |
| December 2025 | 70.25 | 29.75 |
| September 2025 | 70.25 | 29.75 |
| June 2025 | 70.25 | 29.75 |
| March 2025 | 70.25 | 29.75 |
| December 2024 | 70.25 | 29.75 |
Sadbhav Infrastructure Project Limited share price performance
Over the past year the Sadbhav Infrastructure Project Limited share price has lost 40.99%, against a fall of 10.92% for the NIFTY 50, so it has underperformed that index by 30.07 percentage points.
Across the 7 periods in the table, the stock did not beat the NIFTY 50 in any of them. Past returns describe what happened; they do not predict what comes next.
| Period | SADBHIN | NIFTY 50 |
|---|---|---|
| 1 month | -13.08% | +1.91% |
| 3 months | -10.32% | -5.20% |
| 6 months | -16.61% | -3.94% |
| 1 year | -40.99% | -10.92% |
| 2 years | -66.07% | -5.29% |
| 3 years | -46.82% | +20.44% |
| 5 years | -85.56% | +30.45% |
Sadbhav Infrastructure Project Limited vs industry peers
NSE compares Sadbhav Infrastructure Project Limited with 6 other listed companies in Road Assets - Toll Annuity Hybrid-Annuity. By market capitalisation it ranks 4 of 7.
Its P/E of 0.42 compares with a median of 2.58 for the other companies in the group: the market is paying considerably less for each rupee of its recent earnings.
| Company | Market cap | Price (₹) | P/E | Promoter % | Qtr income | Qtr net profit |
|---|---|---|---|---|---|---|
| ATLANTAA | 311 | 38.20 | — | 74.67 | 7.47 | -3.94 |
| BRNL | 115 | 13.64 | — | 51.73 | 1.93 | -153 |
| SADBHAV | 111 | 6.49 | 2.93 | 25.52 | 29.49 | -9.73 |
| SADBHIN | 79.60 | 2.26 | 0.42 | 70.25 | 7.02 | 17.59 |
| NOIDATOLL | 64.42 | 3.46 | 2.23 | 26.37 | 12.81 | 5.26 |
| GAYAHWS | 37.63 | 1.57 | — | 61.15 | 7.62 | -2.75 |
| MEP | 11.74 | 0.64 | — | 23.36 | — | — |
Sadbhav Infrastructure Project Limited announcements, board meetings and corporate actions
Latest announcements
The most recent filings Sadbhav Infrastructure Project Limited has made with NSE, newest first:
- 26-Oct-2026 · Updates: Sadbhav Infrastructure Project Limited has informed the Exchange regarding 'Prior Board Meeting Intimation'. (PDF)
- 08-Oct-2026 · Resignation: Sadbhav Infrastructure Project Limited has informed the Exchange regarding Resignation of Mr Kedar Pandya as Company Secretary & Compliance Officer of the company w.e.f. October 08, 2026. (PDF)
- 08-Oct-2026 · Resignation of Director/KMP/SMP: Sadbhav Infrastructure Project Limited has informed the Exchange about Resignation of Director/KMP/SMP (PDF)
- 03-Oct-2026 · Shareholders meeting: Sadbhav Infrastructure Project Limited has submitted the Exchange a copy Srutinizers report of Annual General Meeting held on September 30, 2026. Further, the company has informed the Exchange regarding voting results. (PDF)
- 30-Sep-2026 · Shareholders meeting: Sadbhav Infrastructure Project Limited has informed the Exchange regarding Proceedings of Annual General Meeting held on September 30, 2026 (PDF)
- 25-Sep-2026 · Trading Window: Sadbhav Infrastructure Project Limited has informed the Exchange regarding the Trading Window closure pursuant to SEBI (Prohibition of Insider Trading) Regulations, 2015 (PDF)
- 08-Sep-2026 · Copy of Newspaper Publication: Sadbhav Infrastructure Project Limited has informed the Exchange about Copy of Newspaper Publication (PDF)
- 07-Sep-2026 · Shareholders meeting: Sadbhav Infrastructure Project Limited has informed the Exchange regarding Notice of Annual General Meeting to be held on September 30, 2026 (PDF)
Board meetings
- 02-Nov-2026 · Financial Results/Other business matters: To consider and approve the financial results for the period ended September 30, 2026 and other business matters
- 27-May-2026 · Financial Results/Other business matters: To consider and approve the financial results for the period ended March 31, 2026 and other business matters
- 12-Feb-2026 · Financial Results/Other business matters: To consider and approve the financial results for the period ended December 31, 2025 and other business matters
- 12-Nov-2025 · Financial Results/Other business matters: To consider and approve the financial results for the period ended September 30, 2025 and other business matters
- 12-Aug-2025 · Financial Results/Other business matters: To consider and approve the financial results for the period ended Jun 30, 2025 and other business matters
Corporate actions
The corporate actions on record include 3 dividends. The ex-date is the first day the shares trade without the entitlement.
- Annual General Meeting · ex-date 23-Sep-2024 · book closure 24-Sep-2024 to 30-Sep-2024
- Annual General Meeting · ex-date 22-Sep-2023 · book closure 24-Sep-2023 to 30-Sep-2023
- Annual General Meeting · ex-date 22-Sep-2022 · book closure 24-Sep-2022 to 30-Sep-2022
- Annual General Meeting · ex-date 21-Sep-2021 · book closure 23-Sep-2021 to 29-Sep-2021
- Annual General Meeting · ex-date 21-Sep-2020 · book closure 23-Sep-2020 to 29-Sep-2020
- Annual General Meeting/Dividend - Rs 0.30 Per Share · ex-date 17-Sep-2019 · book closure 19-Sep-2019 to 25-Sep-2019
- Interim Div - Re 0.20 Per Share · ex-date 26-Nov-2018 · record date 27-Nov-2018
- Annual General Meeting/Dividend Re 0.30 Per Share (Rate Revised) · ex-date 18-Sep-2018 · book closure 20-Sep-2018 to 27-Sep-2018
- Interim Dividend - Re 0.20 Per Share · ex-date 28-Nov-2017 · record date 29-Nov-2017
- Annual General Meeting · ex-date 15-Sep-2017 · book closure 19-Sep-2017 to 26-Sep-2017
Risk notice: low-priced and small-company shares can be illiquid, volatile and subject to manipulation, and shareholders can lose their entire investment. This page is a factual summary, not a recommendation to buy or sell Sadbhav Infrastructure Project Limited.
Where to find Sadbhav Infrastructure Project Limited's financials
Direct downloads from NSE:
- Annual report 2025-26 (PDF, 6.51 MB)
- Annual report 2024-25 (PDF, 19.25 MB)
- Annual report 2023-24 (PDF)
- Annual report 2022-23 (ZIP)
- Annual report 2021-22 (ZIP)
- Annual report 2020-21 (ZIP)
For full financial statements, shareholding detail and every company announcement, go to the source:
- NSE quote pageOfficial price, price band, surveillance status, shareholding pattern and corporate actions.
- Annual reports (NSE)Search “SADBHIN” to download Sadbhav Infrastructure Project Limited's annual reports as filed with the exchange.
- Announcements and results (NSE)Search “SADBHIN” for quarterly results, board meetings and other company filings.
- BSE quote page (539346)BSE price, filings, results and shareholding for the same company.
- ScreenerTen years of profit and loss, balance sheet, cash flow and key ratios.
- TradingView chartInteractive price chart with technical indicators.
- Google FinanceQuick price overview and recent news coverage.
- Yahoo FinanceHistorical prices you can download, plus summary statistics.
Other Road Assets - Toll Annuity Hybrid-Annuity stocks on MCX Trends
- Noida Toll Bridge Company Limited (NOIDATOLL · ₹3.83)
- Bharat Road Network Limited (BRNL · ₹15.29)
- Sadbhav Engineering Limited (SADBHAV · ₹7.18)
- Gayatri Highways Limited (GAYAHWS · ₹1.90)
- ATLANTAA LIMITED (ATLANTAA · ₹35.43)
- MEP Infrastructure Developers Limited (MEP · ₹0.66)
- Allcargo Terminals Limited (ATL · ₹26.82)
- Indiabulls Limited (IBULLSLTD · ₹29.19)
Frequently asked questions
What is the Sadbhav Infrastructure Project Limited share price?
Sadbhav Infrastructure Project Limited (NSE: SADBHIN) closed at ₹3.16 in the end-of-day data for 16 November 2026. For a live price, use the NSE quote page or your broker, because this page is updated from end-of-day files.
Which sector does Sadbhav Infrastructure Project Limited belong to?
NSE classifies Sadbhav Infrastructure Project Limited under Road Assets - Toll Annuity Hybrid-Annuity, in the Services sector.
What is the 52-week high and low of SADBHIN?
The 52-week high is ₹4.79 (11-FEB-2026) and the 52-week low is ₹2.04 (29-OCT-2026), according to NSE.
Is Sadbhav Infrastructure Project Limited a penny stock?
At ₹3.16 the share trades below ₹5, so it appears on our list of penny stocks under ₹5. A low share price on its own says nothing about whether a company is cheap or expensive; market capitalisation, debt, profits and exchange surveillance status matter far more.
What is the promoter holding in Sadbhav Infrastructure Project Limited?
Promoters and the promoter group held 70.25% of Sadbhav Infrastructure Project Limited at the end of September 2026, according to the shareholding pattern filed with NSE.
What were Sadbhav Infrastructure Project Limited's latest quarterly results?
For the quarter ended June 2026, Sadbhav Infrastructure Project Limited reported total income of ₹7.02 crore and a net profit of ₹17.59 crore (EPS ₹0.50).
Where can I find Sadbhav Infrastructure Project Limited's annual report and financial results?
Annual reports, quarterly results and other filings are published on the NSE corporate filings pages (search for SADBHIN) and on BSE. Screener also lays out several years of financial statements in one place. Links to all of these are above.